How to Move Your Office Without Disrupting Work?
Practical strategies to move your office on weekend and find it ready on Monday
Table of Contents
Introduction: Office Moving is Totally Different
Office moving isn't like home moving. There are additional considerations: business continuity, data security, sensitive equipment, and maintaining productivity. One day of downtime can cost company thousands of riyals.
At Al Afdal, we specialize in office relocation with minimal downtime. We've moved offices of all sizes, from small startups to large corporations with hundreds of employees.
This guide explains everything you need for successful office move while maintaining workflow.
At Al Afdal, we specialize in office relocation with minimal downtime. We've moved offices of all sizes, from small startups to large corporations with hundreds of employees.
This guide explains everything you need for successful office move while maintaining workflow.
Advance Planning: 8-12 Weeks Before
**The Earlier You Start, The Better**
**1. Form Moving Team:**
Create team of 3-5 employees responsible for:
- Coordination with moving company
- Logistics planning
- Packing supervision
- Employee communication
**2. Set Timeline:**
- Determine moving date (preferably weekend or holiday)
- Plan each phase in detail
- Calculate expected downtime
- Create emergency backup plan
**3. Choose Specialized Moving Company:**
Not all furniture moving companies suitable for offices. Look for:
- Office moving experience
- Comprehensive equipment insurance
- Technical services (network assembly)
- After-hours work
**4. Assessment and Budget:**
**Small Office (5-10 employees):**
- Cost: 3,000-6,000 SAR
- Time: 6-10 hours
- Downtime: 1-2 days
**Medium Office (20-50 employees):**
- Cost: 8,000-15,000 SAR
- Time: 1-2 days
- Downtime: 2-3 days
**Large Office (100+ employees):**
- Cost: 20,000-50,000 SAR
- Time: 3-5 days
- Downtime: 3-7 days
**1. Form Moving Team:**
Create team of 3-5 employees responsible for:
- Coordination with moving company
- Logistics planning
- Packing supervision
- Employee communication
**2. Set Timeline:**
- Determine moving date (preferably weekend or holiday)
- Plan each phase in detail
- Calculate expected downtime
- Create emergency backup plan
**3. Choose Specialized Moving Company:**
Not all furniture moving companies suitable for offices. Look for:
- Office moving experience
- Comprehensive equipment insurance
- Technical services (network assembly)
- After-hours work
**4. Assessment and Budget:**
**Small Office (5-10 employees):**
- Cost: 3,000-6,000 SAR
- Time: 6-10 hours
- Downtime: 1-2 days
**Medium Office (20-50 employees):**
- Cost: 8,000-15,000 SAR
- Time: 1-2 days
- Downtime: 2-3 days
**Large Office (100+ employees):**
- Cost: 20,000-50,000 SAR
- Time: 3-5 days
- Downtime: 3-7 days
Securing Data and Technical Equipment
**Data = Company's Most Important Asset**
**Two Weeks Before:**
**1. Comprehensive Backup:**
- Copy all data (servers, individual devices)
- Test backups
- Keep off-site copy (cloud)
**2. Servers and Networks:**
- Photograph all connections
- Label all cables
- Create network diagram
- Keep list of all passwords
**3. Computers:**
- Back up important data
- Record number and location of each device
- Disconnect all cables in labeled bags
- Wrap each device with bubble wrap
**4. Printers and Scanners:**
- Remove inks and cartridges
- Secure moving parts
- Wrap with protective materials
**Two Weeks Before:**
**1. Comprehensive Backup:**
- Copy all data (servers, individual devices)
- Test backups
- Keep off-site copy (cloud)
**2. Servers and Networks:**
- Photograph all connections
- Label all cables
- Create network diagram
- Keep list of all passwords
**3. Computers:**
- Back up important data
- Record number and location of each device
- Disconnect all cables in labeled bags
- Wrap each device with bubble wrap
**4. Printers and Scanners:**
- Remove inks and cartridges
- Secure moving parts
- Wrap with protective materials
Downtime Reduction Strategy
**Every Minute Down = Loss**
**Strategy 1: Phased Moving**
- Move different departments on different days
- Start with less critical departments
- Leave vital departments for last
- **Benefit**: Work continues partially
**Strategy 2: Weekend Moving**
- Start Thursday evening
- Work all Friday and Saturday
- Ready for work Sunday morning
- **Benefit**: Only two days down
**Strategy 3: Night Moving**
- Start after work (6 PM)
- Work all night
- Finish before work starts (8 AM)
- **Cost**: +25-35% but no downtime!
**Strategy 4: Pre-setup**
- Fully prepare new office (electricity, internet, AC)
- Arrange basic furniture beforehand
- Test all systems
- **Benefit**: Immediate transition
**Strategy 1: Phased Moving**
- Move different departments on different days
- Start with less critical departments
- Leave vital departments for last
- **Benefit**: Work continues partially
**Strategy 2: Weekend Moving**
- Start Thursday evening
- Work all Friday and Saturday
- Ready for work Sunday morning
- **Benefit**: Only two days down
**Strategy 3: Night Moving**
- Start after work (6 PM)
- Work all night
- Finish before work starts (8 AM)
- **Cost**: +25-35% but no downtime!
**Strategy 4: Pre-setup**
- Fully prepare new office (electricity, internet, AC)
- Arrange basic furniture beforehand
- Test all systems
- **Benefit**: Immediate transition
Moving Day Checklist
**Morning Preparation:**
✅ Moving team arrives on time
✅ Confirm inventory list
✅ Review loading plan
✅ Assign supervisor per department
**Loading:**
✅ Start with closed departments
✅ Label each box clearly (department + desk number)
✅ Photograph sensitive equipment before loading
✅ Keep list of what's loaded
**Transit:**
✅ Escort vehicle for sensitive equipment
✅ Track trucks
✅ Continuous driver communication
**Unloading:**
✅ Start with vital departments (IT, management)
✅ Place each box in correct location
✅ Check equipment upon arrival
✅ Test technical systems
**Next Day:**
✅ Comprehensive equipment check
✅ Solve any technical issues
✅ Organize desks
✅ Resume full operations
✅ Moving team arrives on time
✅ Confirm inventory list
✅ Review loading plan
✅ Assign supervisor per department
**Loading:**
✅ Start with closed departments
✅ Label each box clearly (department + desk number)
✅ Photograph sensitive equipment before loading
✅ Keep list of what's loaded
**Transit:**
✅ Escort vehicle for sensitive equipment
✅ Track trucks
✅ Continuous driver communication
**Unloading:**
✅ Start with vital departments (IT, management)
✅ Place each box in correct location
✅ Check equipment upon arrival
✅ Test technical systems
**Next Day:**
✅ Comprehensive equipment check
✅ Solve any technical issues
✅ Organize desks
✅ Resume full operations
Summary: Successful Office Move
**Key = Early Planning & Precise Execution**
**Major Mistakes to Avoid:**
1. Delaying planning
2. Not making backups
3. Choosing cheapest instead of best
4. Not notifying employees early
5. Ignoring system testing in new office
**Benefits of Using Professional Office Movers:**
- 60-70% downtime reduction
- Sensitive equipment protection
- System assembly expertise
- Comprehensive equipment insurance
At Al Afdal, we've successfully moved offices of all sizes 100%. Call us at 0560586397 for free consultation!
**Major Mistakes to Avoid:**
1. Delaying planning
2. Not making backups
3. Choosing cheapest instead of best
4. Not notifying employees early
5. Ignoring system testing in new office
**Benefits of Using Professional Office Movers:**
- 60-70% downtime reduction
- Sensitive equipment protection
- System assembly expertise
- Comprehensive equipment insurance
At Al Afdal, we've successfully moved offices of all sizes 100%. Call us at 0560586397 for free consultation!
💡
Expert Tip
For best furniture moving experience, book our services early and get free consultation from our specialized team. We provide accurate assessment of your needs and transparent quote without hidden fees.
Enjoyed the Article? Contact Us!
Have questions about this topic? Our team is ready to help